What do I need to know about RF Modulator And Demodulator? In this article, we will analyze some of the precautions in the operation of the voltage regulator, a total of six points to share and interpret, I hope for everyone has a certain reference value!

Note on operation And use of RF Modulator And Demodulator:

1. The high-pressure test requires more than two people to participate in the division of labor. Special person is responsible for on-site safety monitoring and observation of the test status of the test object;

2. Voltage regulator and control box should be reliably grounded;

3. During the test, the voltage boost speed should not be too fast, and sudden full voltage power or power failure is not allowed;

4. In the process of voltage boost or voltage withstand test, if the following abnormal conditions are found, the voltage should be reduced immediately, cut off the power supply, stop the test, and find out the cause of the test. ① Voltmeter pointer swing large; ② The smell and smoke of burnt insulation layer; ③ The subject has abnormal noise.

5. During the test, if the test object is short-circuited or fails, the over-current relay in the oil-immersed high voltage test RF Modulator And Demodulator control box will work. At this time, zero the regulator, cut off the power and then take out the sample.

6. When performing capacitance test or DC high voltage leakage test, after the test is over, zero the voltage regulator, cut off the power supply, and then discharge the high voltage end of the test product or capacitor to the ground with the discharge rod to avoid the danger of electric shock caused by the potential stored in the capacitor.